Budget Amount *help |
¥7,410,000 (Direct Cost: ¥5,700,000、Indirect Cost: ¥1,710,000)
Fiscal Year 2011: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2010: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2009: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2008: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
|
Research Abstract |
Total Utility Demand Prediction System, TUD-PS was established to predict utility demand such as electricity, gas, hot water and air-conditioning load, on a basis of time-varying inhabitants' behavior schedule. In addition, the stochastic characteristics of heating/cooling load of a dwelling in a residential building were investigated based on time-series data estimated by TUD-PS. The analysis indicates that probability density distributions of heating/cooling load normalized by the average for various types of dwelling and family type shows a similar tendency, and optimizing parameters of Erlang distribution were presented.
|