Budget Amount *help |
¥19,500,000 (Direct Cost: ¥15,000,000、Indirect Cost: ¥4,500,000)
Fiscal Year 2014: ¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2013: ¥6,500,000 (Direct Cost: ¥5,000,000、Indirect Cost: ¥1,500,000)
Fiscal Year 2012: ¥8,710,000 (Direct Cost: ¥6,700,000、Indirect Cost: ¥2,010,000)
|
Outline of Final Research Achievements |
In this study, we conducted four research to obtain research results. 1. Damage analysis of Kumano Pilgrimage Routes in the Kii Mountain Range by satellite data and field surveys, etc., 2. Opening and meteorological data analysis of meteorological monitoring point, 3.The heavy rain analysis by the construction of high-density rainfall data set 80 years in the Kii Mountain Range, 4. Deterioration recovery investigation and analysis of vegetation by forest floor images and spectroscopy.
|