Budget Amount *help |
¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
Fiscal Year 2014: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2013: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2012: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
|
Outline of Final Research Achievements |
First, we have proposed a tool chain and a real time operating system for energy optimization of embedded real-time application. The framework conducts both design time and run time optimization so that the energy consumption can be minimized. Its effectiveness has been validated by simulation and experiments on a real chip. Second, to save energy for task with long execution time, we have proposed a task migration model and an ILP (Integer linear Programming) formulation to divide the large task into two small subtasks which can migrate between two processors. The simulation results demonstrated our method can save as much as 10% energy than existing methods.
|