Budget Amount *help |
¥14,690,000 (Direct Cost: ¥11,300,000、Indirect Cost: ¥3,390,000)
Fiscal Year 2017: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2016: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2015: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2014: ¥9,620,000 (Direct Cost: ¥7,400,000、Indirect Cost: ¥2,220,000)
|
Outline of Final Research Achievements |
In order to construct a prediction method of chloride ion permeation for unsaturated concrete based on the electrical properties of concrete obtained by some electrochemical nondestructive tests, this study stacked and summarized the basic knowledge - namely, (1) the relationship between apparent diffusion coefficient and electric resistance of unsaturated cement paste, (2) the relationship between apparent diffusion coefficient of chloride ion of concrete immersed in seawater for a long time and diffusion coefficient estimated from electric resistivity, (3) the development of nondestructive evaluation test of moisture content distribution in concrete.
|