研究課題/領域番号 |
23K13626
|
研究種目 |
若手研究
|
配分区分 | 基金 |
審査区分 |
小区分28020:ナノ構造物理関連
|
研究機関 | 豊田工業大学 |
研究代表者 |
|
研究期間 (年度) |
2023-04-01 – 2025-03-31
|
研究課題ステータス |
交付 (2023年度)
|
配分額 *注記 |
4,680千円 (直接経費: 3,600千円、間接経費: 1,080千円)
2024年度: 1,820千円 (直接経費: 1,400千円、間接経費: 420千円)
2023年度: 2,860千円 (直接経費: 2,200千円、間接経費: 660千円)
|
キーワード | quantum dots / submonolayer / spintronics / epitaxy |
研究開始時の研究の概要 |
The research plan includes 3 parts. Part 1 involves the purchase of supplies and initial assembly and modification of the optical setup. Once the setup is completed, initial spin measurements will be done using existing 3D SML QD samples. This part will take about 3~6 months. Part 2 involves additional optimization of the optical setup, including the realization of smaller spot size in order to measure individual 3D SML QDs. This part will take about 3~6 months. Part 3 will be optimization of the 3D SML QD samples. This will require several sample growths (rest of the project duration).
|
研究実績の概要 |
As outlined in the Purpose of the Research, the objective is to study the realization of spin qubits based on 3D SML QDs. Towards this goal, there are several targets. The first target that was set is to the measure the optically spin dynamics in an ensemble of 3D SML QDs. This has been successfully achieved. An optical setup that can perform this measurement was developed by August 2023. The second target that was set is to optimize the optical setup to minimize the spot size to be able to measure few or single 3D SML QDs. This has partially been achieved. The spot size of the optical setup was reduced from 1000 micron to around 25 micron, which would allow for finer measurements of few 3D SML QDs. The third target is to optimize the samples. This is presently being carried out.
|
現在までの達成度 (区分) |
現在までの達成度 (区分)
2: おおむね順調に進展している
理由
Presently, the about half of the targets have already been achieved. The rest of targets are expected to be completed by the end of the project. The optical setup proposed for project has already been developed. Further optimization may still be needed in the future, but the setup is already operational. The bulk of the work ahead would be the preparation and optimization of the samples. In order to achieved the final target, samples with low density of 3D SML QDs need to be prepared. This will take several optimization cycles and may take several months more to complete.
|
今後の研究の推進方策 |
For the future work, the main focus would be preparation and optimization of the 3D SML QD samples. This may take several months to finish. So far no change in the proposed research plans is expected.
|