-
[文献書誌] 松井 正之: "日本的生産方式の待ち行列的考察と二段階設計"日本経営工学会論文誌. 52巻、2号. 69-79 (2001)
-
[文献書誌] M.Matui: "The Performance Evalution of Flixible Manufacturing Systems with Finite Local Buffers : Fixed and Dynamic Routings"International Journal of Flexible Manufacturing Systems. 13巻、43. 405-424 (2001)
-
[文献書誌] N.Nakase: "A. Management Design Approach to a Simple Flexible Assembly System"International Journal of Production Economics. (印刷中).
-
[文献書誌] J. Ma: "Performance Evalution of a Flixible Machining/Assembly System and Routing Comparisons"International Journal of Production Research. (印刷中).
-
[文献書誌] M.Matui: "A. Management Game Model : Economic Traffic, Leadtime and Pricing Setting"Journal of Japan Industrial Management Association. 53巻、1号(印刷中).
-
[文献書誌] 松井 正之: "受注残制御をもつ個別生産システムの二段階設計法とその適用研究"日本経営工学会論文誌. 53巻2号(印刷中).
-
[文献書誌] M.Matui: "A Queaeing /Mamegement Consideration on Japanese Production Systems"Production Planning and Control. (印刷中).