研究実績の概要

The goal of the project is to set the zero point of near infrared photometry in cgs units (the AB system). The current project consists of a series of instrumentation and experiments towards this goal. This is not a project that directly produces science results, but a project indispensable to a vast variety of astronomical observations for near infrared bands to derive useful scientific results.The present project is purely of technical nature which becomes science only when we obtain the final results.

The first year is to prepare optical filters for the experimental device. After a number of iterations with Subaru Tele-scope in Hawaii and also with Asahi Spectra Co Ltd, the manufacturer of optical filters, we made a final design of the z-band optical filter and procured them by the end of March, with the preliminary transmission curve looked satisfactory.

現在までの達成度 (区分)
現在までの達成度 (区分)

3: やや遅れている

理由

According to the original plan, we measure the response of the MOIRCS detector in both i and z bands.While we have been studying their design, the Subaru team in Hawaii last autumn changed the specification of the MOIRCS detector. This sets back our original project, forced us to modify our strategy, discarding the i band measurement, which is now completely screened out by renewed MOIRCS optics. This was a bad news to us. This forces us to redesign our strategy, discarding the i band measurement, and at a technical level the characters of z band fiters, with understanding that we cannot ac- hieve a high accuracy as we originally aimed. After iterations with Asahi Spectra, we reached an optimal solution.
This procedure caused delay.

今後の研究の推進方策

We first verify the transmission curves of procured filters. We then bring the filters to Hawaii and install them on the MOIRCS detectors, when they were brought to the room temperature, which is expected in August.
The support bench will be fabricated by summer, which will also be shipped to Hawaii.

We expect to carry out response measurements when MOIRCS is free from the observation use in Hawaii. As we were told, we expect it in late fall.

次年度使用額が生じた理由

Procuremnet of filters were delayed, caused originally by the specification modification of the Subaru MOIRCS detector in the Hawaii observatory.
This caused a half year delay.

次年度使用額の使用計画

We purchase a few incandescent tungusten lamps, a few photodiode, and a power supply and connecting wires etc, after checking what are available in Hawaii Observatory.We will design (being done) and ask the NAOJ machine shop to fabricate supporting benches for the lamp.
The cost of extra liquid nitrogen needed for our work should also be paid.The rest is travel expenses to observatories, and also to various institutes to meet people.

  • 研究成果

    (2件)

すべて 2015 その他

すべて 国際共同研究 (1件) 雑誌論文 (1件) (うち国際共著 1件、 査読あり 1件、 謝辞記載あり 1件)

  • [国際共同研究] Princeton University/Johns Hopkins University/Institute for Advanced Study(U.S.A.)

    • 国名
      米国
    • 外国機関名
      Princeton University/Johns Hopkins University/Institute for Advanced Study
  • [雑誌論文] The nature of damped Lyman-alpha and Mg II absorbers explored through their dust contents2015

    • 著者名/発表者名
      M. Fukugita and B. Menard,
    • 雑誌名

      Astrophysical Journal

      巻: 799 ページ: -

    • DOI

      10.1088/0004-637X/799/2/195

    • 査読あり / 国際共著 / 謝辞記載あり

URL: 

公開日: 2017-01-06  

サービス概要 検索マニュアル よくある質問 お知らせ 利用規程 科研費による研究の帰属

Powered by NII kakenhi