2015 Fiscal Year Final Research Report
A study of management technologies in the early project stages
Project/Area Number |
25350455
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Social systems engineering/Safety system
|
Research Institution | Bunkyo University |
Principal Investigator |
|
Co-Investigator(Kenkyū-buntansha) |
TAKANO Yuichi 専修大学, ネットワーク情報学部, 准教授 (40602959)
|
Project Period (FY) |
2013-04-01 – 2016-03-31
|
Keywords | プロジェクトマネジメント / 超上流工程 / 競争入札 / コスト見積 / EPCランプサム契約 / 受注戦略 / 受注産業 / リスクマネジメント |
Outline of Final Research Achievements |
In this study, we carried out research and development regarding the methods that make high quality project plans efficiently and also the methods that control repetitive activities in the very early stage of the project in order to bring the project to a successful conclusion. As the results, we developed the order acceptance strategy and the bid price decision algorithms that maximize the expected profits from the projects under the condition of limited man-hours. In addition, we built a simulation model of project cost estimation activities carried out in the very early stage of the project, then study the methods to control the cost estimation activities by using the model.
|
Free Research Field |
経営工学
|