• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to project page

2016 Fiscal Year Final Research Report

Study on establishment of design method for connection for reuse bridge

Research Project

  • PDF
Project/Area Number 25820201
Research Category

Grant-in-Aid for Young Scientists (B)

Allocation TypeMulti-year Fund
Research Field Structural engineering/Earthquake engineering/Maintenance management engineering
Research InstitutionKyoto University (2014-2016)
Utsunomiya University (2013)

Principal Investigator

Suzuki Yasuo  京都大学, 工学研究科, 助教 (50431698)

Project Period (FY) 2013-04-01 – 2017-03-31
Keywords高力ボルト引張接合 / 高力ボルト摩擦接合 / 併用継手 / 仮設桁 / リユース橋梁
Outline of Final Research Achievements

In this research, in order to realize the member connection structure of the recycling / reuse bridge which is easy to assemble / disassemble, the new main girder which combined the high strength bolted tensile joint and the friction joint proposed by the research representatives It aims at strengthening the connection structure and establishing its design method.
As a result of examining the influence of the difference in the structural details of the flange connection part on the joint strength and deformability, it was found that the structure attached vertically to the structure in which the stiffening rib of the flange connection part is mounted parallel to the main girder flange is larger It is clarified that the deformation amount of the strength and the maximum strength character increases and it becomes a more ductile failure mode. In addition, we proposed a bending strength calculation method with higher accuracy than conventional strength calculation method.

Free Research Field

構造工学・地震工学・維持管理工学

URL: 

Published: 2018-03-22  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi