Outline of Final Research Achievements |
In order to develop “visualization technology for raw material softening behavior in high temperature process aiming for sustainable low carbon ironmaking”, 3D dimensional information and slag melt physical properties of slag particle bed layer during softening at high temperature were given to particle method numerical simulation. As a result, basic numerical model to predict for gas and liquid flow in slag particle bed layer during softening at high temperature was established.
|