Budget Amount *help |
¥3,510,000 (Direct Cost: ¥2,700,000、Indirect Cost: ¥810,000)
Fiscal Year 2017: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2016: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2015: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
|
Outline of Final Research Achievements |
In this research, we develop a retrieval method for assembly models created by using three-dimensional CAD. The proposed method distinguish not only the shape of an entire assembly model and the components constituting it, the number of the components but also the geometric layouts of the components. In order to realize robust retrieval against changes in orientation and position of an assembly model and against differences in size and shape of the components, we propose the method to reflect differences in internal structure of the assembly model to projections and the retrieval algorithm based on the projections.
|