Budget Amount *help |
¥3,640,000 (Direct Cost: ¥2,800,000、Indirect Cost: ¥840,000)
Fiscal Year 2016: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
Fiscal Year 2015: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Outline of Final Research Achievements |
The purpose of this study is to reduce a work error such as an error in the assembly order of parts, a forgetting to install the parts. In particular, in this research, we examined the camera position to capture the work in two ways. One is estimating work contents by installing the camera on the ceiling and analyzing the image. The other is estimating work contents by the wearable camera and analyzing the image.
|