Budget Amount *help |
¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2016: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2015: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Outline of Final Research Achievements |
We have proposed a coating system with a duplex layer structure containing a Re-based alloy phase. Using Re-based alloys fabricated by tetra-arc furnace, the tie-line compositions of each phase in a Re-Nb-Al, Re-Nb-Si, and Re-Si-Al systems were experimentally determined.
|