Budget Amount *help |
¥17,160,000 (Direct Cost: ¥13,200,000、Indirect Cost: ¥3,960,000)
Fiscal Year 2020: ¥6,110,000 (Direct Cost: ¥4,700,000、Indirect Cost: ¥1,410,000)
Fiscal Year 2019: ¥6,110,000 (Direct Cost: ¥4,700,000、Indirect Cost: ¥1,410,000)
Fiscal Year 2018: ¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
|
Outline of Final Research Achievements |
Design softwares used for manufacturing require efficient and realistic CG rendering techniques. Although several methods have been proposed for this purpose, most of them rely on heuristic assumptions. This incurs users on tedious parameter tunings to obtain rendering results with desired accuracies. This research project aims to develop a rendering method that can estimate the error accurately and control the error, which can eliminate the tedious parameter tunings from the users. Our method only requires two intuitive parameters and can render the results with desired accuracy.
|