• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

A New Operating System Applying the Concept of "Production Seat Booking System" for Engineer-to-Order Production

Research Project

Project/Area Number 18K04620
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeMulti-year Fund
Section一般
Review Section Basic Section 25010:Social systems engineering-related
Research InstitutionKanagawa University (2019-2020)
Waseda University (2018)

Principal Investigator

Weng Jiahua  神奈川大学, 工学部, 准教授 (40367040)

Project Period (FY) 2018-04-01 – 2021-03-31
Project Status Completed (Fiscal Year 2020)
Budget Amount *help
¥3,120,000 (Direct Cost: ¥2,400,000、Indirect Cost: ¥720,000)
Fiscal Year 2020: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2019: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2018: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Keywords個別受注設計生産 / 生産座席 / Engineer-to-order / 製品仕様項目 / 受注予定枠 / 注文引当 / 個別受注生産 / 受注予約枠 / 受注座席 / 部品活用 / タブーサーチ― / 製品機能項目・性能区分 / 多機能部品 / 単機能部品 / 共通部品 / 生産座席方式
Outline of Final Research Achievements

This study focuses on engineer-to-order (ETO) manufacturing firms which need to provide customized products in short due date. Because parts need to be readied before orders arrive, high parts inventory and low order-received rates always form the bottleneck to efficiency. To solve this problem, a new operating system applying the concept of “production seat booking system” is developed. Order-receiving schedule of each product functional specification items are represented as “seats”, such that salespeople can easily check whether a vacant seat is available and then quote an accurate delivery due date to their customers. Methods of preparing parts by using the future inquiry information, and predetermining order-receiving plan to utilize the available parts are proposed. The effect of the proposed operating system on both increased orders and reduced parts inventory are confirmed.

Academic Significance and Societal Importance of the Research Achievements

見込み生産や少品種の受注生産にしか生産座席方式が適用できていない現状に対して,製品「機能項目・性能区分」単位で座席を定義することを提案し,超多品種でも座席方式を適用できるようにした点では,学術的に意義がある.また,部品消費実績の代わりに引き合い情報を活用した部品手配量見積法を提案し,その上,手配済み部品の活用を考慮した予約座席の設定方法を提案し,座席方式を用いない受注方式に比べ,失注と在庫両方を低減できることを数値実験で確認した.当方式の利用によって,対象企業が抱えている部品過不足による失注及び膨大な部品在庫問題を解決可能なこと示せたことで,産学両方にとって意義があると考えられる.

Report

(4 results)
  • 2020 Annual Research Report   Final Research Report ( PDF )
  • 2019 Research-status Report
  • 2018 Research-status Report
  • Research Products

    (9 results)

All 2021 2020 2019 2018

All Journal Article (2 results) (of which Peer Reviewed: 2 results) Presentation (7 results) (of which Int'l Joint Research: 3 results)

  • [Journal Article] Tabu-search-based Order Seat Planning for Engineer-to-order Manufacturing2020

    • Author(s)
      Xiaofu Fan, Jiahua Weng
    • Journal Title

      Asian Journal of Management Science and Applications

      Volume: 5 Issue: 2 Pages: 160-180

    • DOI

      10.1504/ajmsa.2020.112742

    • Related Report
      2020 Annual Research Report
    • Peer Reviewed
  • [Journal Article] Smart Manufacturing Operating Systems Considering Parts Utilization for Engineer-to-Order Production with Make-to-Stock Parts2020

    • Author(s)
      Jiahua Weng, Shota Mizoguchi, Shingo Akasaka and Hisashi Onari
    • Journal Title

      International Journal of Production Economics

      Volume: 220 Pages: 1-7

    • DOI

      10.1016/j.ijpe.2019.07.032

    • Related Report
      2019 Research-status Report
    • Peer Reviewed
  • [Presentation] 部品コストを考慮した製品機能仕様の決定方式2021

    • Author(s)
      柴田 有里奈, 赤坂 信悟, 翁 嘉華
    • Organizer
      日本経営工学会2021春季大会
    • Related Report
      2020 Annual Research Report
  • [Presentation] 製品設計変更のための設計支援システムに関する研究2020

    • Author(s)
      劉楚恒, 赤坂信悟, 翁嘉華
    • Organizer
      日本経営工学会春季大会
    • Related Report
      2020 Annual Research Report
  • [Presentation] A study on order-receiving plan applying production seat system for sales staff in engineer-to-order manufactory2019

    • Author(s)
      Xiaofu Fan and Jiahua Weng
    • Organizer
      2019 Asian Conference of Management Science & Applications
    • Related Report
      2019 Research-status Report
    • Int'l Joint Research
  • [Presentation] A Study on Parts Preparation for Engineer-to-order Production2019

    • Author(s)
      Yuchen Wu and Jiahua Weng
    • Organizer
      2019 Asian Conference of Management Science & Applications
    • Related Report
      2019 Research-status Report
    • Int'l Joint Research
  • [Presentation] 生産座席を用いた個別受注生産方式の提案 -部品活用方法についての一考察-2019

    • Author(s)
      翁嘉華
    • Organizer
      日本経営工学会春季大会
    • Related Report
      2019 Research-status Report
  • [Presentation] 生産座席を用いた個別受注生産方式の提案 -部品活用方法についての一考察-2019

    • Author(s)
      翁 嘉華
    • Organizer
      日本経営工学会春季大会
    • Related Report
      2018 Research-status Report
  • [Presentation] Order-receiving planning by considering parts inventory for Engineer-to-order production2018

    • Author(s)
      J. Weng, S.Mizoguchi,S.Akasaka and H.Onari
    • Organizer
      The 23rd Asia-Pacific Decision Science Institute International Conference (APDSI 2018)
    • Related Report
      2018 Research-status Report
    • Int'l Joint Research

URL: 

Published: 2018-04-23   Modified: 2022-01-27  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi