Budget Amount *help |
¥48,100,000 (Direct Cost: ¥37,000,000、Indirect Cost: ¥11,100,000)
Fiscal Year 2009: ¥9,880,000 (Direct Cost: ¥7,600,000、Indirect Cost: ¥2,280,000)
Fiscal Year 2008: ¥17,940,000 (Direct Cost: ¥13,800,000、Indirect Cost: ¥4,140,000)
Fiscal Year 2007: ¥20,280,000 (Direct Cost: ¥15,600,000、Indirect Cost: ¥4,680,000)
|
Research Abstract |
To clarify the failure progress behavior of structural concrete, the image analysis system which can identify the localization of strain in real time has been completed. In addition, the super high speed photography system which can capture high-speed crack development and the wide-area image analysis system which can be applied to large-scale concrete structures have been established. Finally, by integrating these systems, the new image analysis system to capture the failure progress behavior of various concrete structures has been presented.
|