Budget Amount *help |
¥45,240,000 (Direct Cost: ¥34,800,000、Indirect Cost: ¥10,440,000)
Fiscal Year 2010: ¥6,760,000 (Direct Cost: ¥5,200,000、Indirect Cost: ¥1,560,000)
Fiscal Year 2009: ¥13,780,000 (Direct Cost: ¥10,600,000、Indirect Cost: ¥3,180,000)
Fiscal Year 2008: ¥16,510,000 (Direct Cost: ¥12,700,000、Indirect Cost: ¥3,810,000)
Fiscal Year 2007: ¥8,190,000 (Direct Cost: ¥6,300,000、Indirect Cost: ¥1,890,000)
|
Research Abstract |
Incorrect and unconservative estimates for either damage or safety limit can result during design of passive control system for buildings. The present study has characterized and treated various factors detrimental to passive control effectiveness in the following two ways : (1) Effects of balance between frame and damper are clarified based on their detailed analyses and full-scale experiments. (2) Various methods are proposed for design, evaluation, and analysis of the passively-controlled buildings, as well as for treatment of various factors detrimental to passive control effectiveness.
|