Budget Amount *help |
¥8,060,000 (Direct Cost: ¥6,200,000、Indirect Cost: ¥1,860,000)
Fiscal Year 2009: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
Fiscal Year 2008: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
Fiscal Year 2007: ¥3,120,000 (Direct Cost: ¥2,400,000、Indirect Cost: ¥720,000)
|
Research Abstract |
This study considers of the reconstruction of two stone structures and two rock-cut structures discovered from Abusir-south site in Egypt. A huge number of stone from the Khaemwaset' s stone structure had scattered on the slope of the hill. As a result of analyzing these stones, a space with open papyrus columns had been constructed in the stone structure was supposed. In the research of rock-cut structure, a series of digging process was considered compared with several rock-cut tombs in the Dahshur-north site and the Luxor area.
|