Budget Amount *help |
¥20,150,000 (Direct Cost: ¥15,500,000、Indirect Cost: ¥4,650,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥15,990,000 (Direct Cost: ¥12,300,000、Indirect Cost: ¥3,690,000)
Fiscal Year 2008: ¥3,380,000 (Direct Cost: ¥2,600,000、Indirect Cost: ¥780,000)
|
Research Abstract |
The summary of research : We prepared for documents collection and the making of about the experience value of the city standard and carried out the field work about some cities that attracted attention by the culture industry including the design. We examined the design of the sign system and conducted experiments of design about producing the sign system and website, studied the feasibility of "valuable experience" with the cooperation of Nagoya city. I summarized these date and report,making the date analysis and the mapping.
|