Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2008: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Research Abstract |
I have developed Bayesian methods for solving statistical problems in an environmental issue, especially identification problems appearing in source receptor modeling, factorial experiment of the measurement of environmental chemicals, assessment of ecological risk, radar remote sensing of rainfall, and trend analysis of water quality in Tokyo Bay. The methods developed in this research have been applied to actual environmental problems to verify practicality of the methods and to contribute to solve those environmental problems.
|