Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2010: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2008: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
|
Research Abstract |
The purpose of this study is to establish the basics of cultural property inquiry techniques using the loop coils. This study intends to clarify problems for the practical use of this method. I performed the inspection of the loop coil method, the design of the surveying instruments on the field, and the development of the concrete analytical techniques for the buried cultural property survey. I added an original device to a signal generator loop and receiving loop equipment. I also suggested the effective way in a data processing. The loop coil method is advantageous to the buried cultural property survey and it has a high resolving power and efficiency.
|