Development of a Practical Model of Robustness-Directed Dynamic Scheduling
Project/Area Number |
20510151
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Social systems engineering/Safety system
|
Research Institution | Setsunan University |
Principal Investigator |
SUWA Haruhiko Setsunan University, 理工学部, 教授 (40299029)
|
Project Period (FY) |
2008 – 2010
|
Project Status |
Completed (Fiscal Year 2010)
|
Budget Amount *help |
¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2010: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2008: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Keywords | プロジェクト管理 / スケジューリング方策 / 意思決定モデル / 不確実性 / 動的スケジューリング / 頑健性 |
Research Abstract |
The framework of processes of schedule revision in manufacturing is generically called dynamic scheduling. Many researchers in industrial engineering have studied from the viewpoint of productivity and the responsibility to changes in manufacturing environments. Schedule revision might lead to risks of reallocation of resources as well as disturbances in production control, therefore it is much important to consider "robustness" in scheduling. This study attempts to build a model of dynamic scheduling directing robustness of schedules. To enhance the robustness of ongoing schedule is expected to realize decision-makings friendly to the shop-floor.
|
Report
(4 results)
Research Products
(33 results)