Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2010: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2009: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2008: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
|
Research Abstract |
Miniaturization of the installation space was tried with thinking out the aspect and distribution of a solar cell module with a plant shot model. Consequently, various plant shoot configurations were optimized under the purpose of maximizing the received quantity of the solar radiation in a day, and arrangement of the solar cell module was planned. It showed clearly for the acceptance surface of a plant shoot with a division leaf to be able to reduce installation spaces largely from the results of numerical simulation compared with a flat plate type solar cell module.
|