• Search Research Projects
  • Search Researchers
  • How to Use
  1. Back to previous page

A Study on a cooperative fusion of Order Life-cycle Management and Production Scheduling

Research Project

Project/Area Number 20560388
Research Category

Grant-in-Aid for Scientific Research (C)

Allocation TypeSingle-year Grants
Section一般
Research Field System engineering
Research InstitutionWaseda University

Principal Investigator

FUJIMURA Shigeru  Waseda University, 理工学術院, 教授 (00367179)

Project Period (FY) 2008 – 2010
Project Status Completed (Fiscal Year 2010)
Budget Amount *help
¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2010: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2009: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2008: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Keywords生産計画・スケジューリング / オーダライフサイクルマネジメント / 多段階スケジューリング / オーダ管理 / サプライチェーンマネジメント / 生産スケジューリング / 生産計画 / 受注システム
Research Abstract

Order Life-cycle Management (OLM) is to manage information changing in the life cycle of many kinds of orders utilized in manufacturing companies. It improves the smart and prompt decision-making in dynamically changing situations. In this study, the novel approach integrating many kinds of production planning and scheduling modules with an OLM system to realize the high performance Supply Chain Management (SCM) is proposed. The database for an OLM system according to Order Transition Model utilizes past records of order information with influence relations between orders. Many kinds of information are extracted from it and transferred to a production planning and scheduling module as a processing module in a multi-stage scheduling system.

Report

(4 results)
  • 2010 Annual Research Report   Final Research Report ( PDF )
  • 2009 Annual Research Report
  • 2008 Annual Research Report
  • Research Products

    (20 results)

All 2012 2011 2010 2009 2008 Other

All Journal Article (6 results) (of which Peer Reviewed: 6 results) Presentation (13 results) Remarks (1 results)

  • [Journal Article] Multiobjective Process Planning and Scheduling Using Improved Vector Evaluated Genetic Algorithm with Archive2012

    • Author(s)
      Wenqiang Zhang, Shigeru Fujimura
    • Journal Title

      Transaction On Electrical and Electronic Engineering IEEJ Trans. Vol.7, Issue 3(To be published)

    • Related Report
      2010 Final Research Report
    • Peer Reviewed
  • [Journal Article] Multi-update Mode Quantum Evolutionary Algorithm and Its Applications to Combination and Permutation Problems2012

    • Author(s)
      Xin Wei, Shigeru Fujimura
    • Journal Title

      Transaction On Electrical and Electronic Engineering IEEJ Trans. Vol.7, Issue 2(To be published)

    • Related Report
      2010 Final Research Report
    • Peer Reviewed
  • [Journal Article] Conception of self-construction production scheduling system2010

    • Author(s)
      Hai Xue, Xuerui Zhang, Yasuhiro Shimizu, Shigeru Fujimura
    • Journal Title

      Electronics and Communications in Japan 93(1)

      Pages: 19-29

    • NAID

      210000181997

    • Related Report
      2010 Final Research Report
    • Peer Reviewed
  • [Journal Article] Distributed Intelligence Approaches for Weighted Just-In-Time Production2010

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Journal Title

      Transaction On Electrical and Electronic Engineering IEEJ Tans. 5(5)

      Pages: 560-568

    • NAID

      10026582105

    • Related Report
      2010 Final Research Report
    • Peer Reviewed
  • [Journal Article] Self Evolution Algorithm to Minimize Earliness and Tardiness Penalties with a Common Due Date on a Single-Machine2008

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Journal Title

      Transaction On Electrical and Electronic Engineering IEEJ Trans. Vol.3, Issue 6

      Pages: 604-611

    • NAID

      10025773522

    • Related Report
      2010 Final Research Report
    • Peer Reviewed
  • [Journal Article] Self Evolution Algorithm to Minimize Earliness and Tardiness Penalties with a Common Due Date on a Single-Maohine2008

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Journal Title

      Transaction On Electrical and Electronic Engineering (IEEJ Trans 2008, Vol. 3) 3

      Pages: 604-611

    • Related Report
      2008 Annual Research Report
    • Peer Reviewed
  • [Presentation] 業務プロセスモデリングによる生産管理のためのシステム開発2011

    • Author(s)
      藤村茂
    • Organizer
      平成23年電気学会全国大会シンポジウム
    • Place of Presentation
      大阪
    • Year and Date
      2011-03-18
    • Related Report
      2010 Final Research Report
  • [Presentation] 業務プロセスモデリングによる生産管理のためのシステム開発2011

    • Author(s)
      藤村茂
    • Organizer
      平成23年電気学会全国大会 シンポジウム
    • Place of Presentation
      大阪
    • Year and Date
      2011-03-18
    • Related Report
      2010 Annual Research Report
  • [Presentation] Development Methodology for Production Scheduling Systems using Business Process Modeling2011

    • Author(s)
      藤村茂
    • Organizer
      21th International Conference on Production Research
    • Place of Presentation
      Stuttgart, Germany
    • Related Report
      2010 Final Research Report
  • [Presentation] Cooperated Integration Framework of Production Planning and Scheduling based on Order Life-cycle Management2011

    • Author(s)
      藤村茂
    • Organizer
      KEPS Workshop(Knowledge Engineering for Planning and Scheduling), 21st International Conference on Automated Planning and Scheduling
    • Place of Presentation
      Freiburg, Germany
    • Related Report
      2010 Final Research Report
  • [Presentation] Multi-Objective Quantum Evolutionary Algorithm for Discrete Multi-Objective Combinational Problem2010

    • Author(s)
      Xin Wei, Shigeru Fujimura
    • Organizer
      The 2010 Conference on Technologies and Applications of Artificial Intelligence TAAI 2010
    • Place of Presentation
      Hsinchu, China
    • Year and Date
      2010-11-18
    • Related Report
      2010 Annual Research Report
  • [Presentation] Improved Vector Evaluated Genetic Algorithm with Archive for Solving Multiobjective PPS Problem2010

    • Author(s)
      Wenqiang Zhang, Shigeru Fujimura
    • Organizer
      The international conference on Management Science and Artificial Intelligence (MSAI)
    • Place of Presentation
      Henan, China
    • Year and Date
      2010-11-04
    • Related Report
      2010 Annual Research Report
  • [Presentation] バッチプロセス産業におけるオーダライフサイクルマネジメントと生産スケジューリングの融合2010

    • Author(s)
      藤村茂
    • Organizer
      スケジューリング・シンポジウム2010
    • Place of Presentation
      東京
    • Year and Date
      2010-09-11
    • Related Report
      2010 Annual Research Report 2010 Final Research Report
  • [Presentation] オーダライフサイクルマネジメントと生産スケジューリングの融合2010

    • Author(s)
      藤村茂,福井淳
    • Organizer
      平成22年電気学会C部門大会
    • Place of Presentation
      熊本
    • Year and Date
      2010-09-02
    • Related Report
      2010 Annual Research Report 2010 Final Research Report
  • [Presentation] Flexible Flow Shop Scheduling by Intelligent Multi-agents2010

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Organizer
      8th ASIC Conference of Software Engineering Research, Management and Applications (SERA)
    • Place of Presentation
      Montreal, Canada
    • Year and Date
      2010-05-24
    • Related Report
      2010 Annual Research Report
  • [Presentation] SIMULATION MODELING OF AUTOMATED GUIDED VEHICLE SYSTEM BASED ON JIT PHILOSOPHY2009

    • Author(s)
      Zheng Yao, Shigeru Fujimura
    • Organizer
      20th International Conference on Production Research
    • Place of Presentation
      Shanghai, China
    • Related Report
      2009 Annual Research Report
  • [Presentation] Online Scheduling of Flexible Flow Shop Manufacturing2009

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Organizer
      2nd International Joint Conference on Computational Sciences and Optimization(CSO 2009)
    • Place of Presentation
      Sanya, Hainan Island, China
    • Related Report
      2009 Annual Research Report
  • [Presentation] Intelligent Production Control System for Multi-Machines2009

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Organizer
      International Symposium on Scheduling 2009(ISS 2009)
    • Place of Presentation
      Nagoya, Japan
    • Related Report
      2009 Annual Research Report
  • [Presentation] Self Evolution Algorithm for Common Due Date Scheduling Problem2008

    • Author(s)
      Wei Weng, Shigeru Fujimura
    • Organizer
      6th IEEE International Conference on Automation Science and Engineering, pp. 790-795
    • Place of Presentation
      Washington, D. C., US
    • Related Report
      2008 Annual Research Report
  • [Remarks] ホームページ等

    • URL

      http://www.fujimura-lab.org/

    • Related Report
      2010 Final Research Report

URL: 

Published: 2008-04-01   Modified: 2016-04-21  

Information User Guide FAQ News Terms of Use Attribution of KAKENHI

Powered by NII kakenhi