The aim of this study is to develop a method for seismic evaluation of reclamation seawall using microtremors. The method uses not only existing drawing and specification but also microtremors records to make numerical analysis models of ground and structure. The method is examined for a reclamation seawall at Toyosu, Tokyo. As a result, it is shown to be able to make numerical analysis models by analysis of microtremors record and FEM.
|