Budget Amount *help |
¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2010: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2009: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2008: ¥2,860,000 (Direct Cost: ¥2,200,000、Indirect Cost: ¥660,000)
|
Research Abstract |
We developed new micro-structural analysis methods using x-ray analysis and electron microscopy. The new analysis methods using x-ray and electron microscopy are useful to analyze the homogeneous and inhomogeneous dislocation structures, found in such as lath martensite and deformed materials, respectively. And we applied the methods to analyses of deformation structure and succeeded in clarifying the development of a fine deformation structure in a lath martensite structure.
|