Evaluation of bearing's failure process through real-time hybrid experiment
Project/Area Number |
20760303
|
Research Category |
Grant-in-Aid for Young Scientists (B)
|
Allocation Type | Single-year Grants |
Research Field |
Structural engineering/Earthquake engineering/Maintenance management engineering
|
Research Institution | Railway Technical Research Institute |
Principal Investigator |
TOYOOKA Akihiro Railway Technical Research Institute, 構造物技術研究部・耐震構造, 副主任研究員 (80425917)
|
Project Period (FY) |
2008 – 2010
|
Project Status |
Completed (Fiscal Year 2010)
|
Budget Amount *help |
¥4,160,000 (Direct Cost: ¥3,200,000、Indirect Cost: ¥960,000)
Fiscal Year 2010: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2009: ¥1,690,000 (Direct Cost: ¥1,300,000、Indirect Cost: ¥390,000)
Fiscal Year 2008: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
|
Keywords | 振動台 / 動的ハイブリッド実験 / 支承部 / 大型振動台 / 支承の破壊モード / ハイブリッド実験システム / デジタルシグナルプロセッサ / 弾性供試体による検証 / Operator Splitting法 |
Research Abstract |
In this research, a real-time substructure hybrid experiment system was developed. This system enables the dynamic loading test of the bearing, considering the dynamic interaction between girder and pier. A 2DOF hybrid tests assuming the pier, bearing and girder were carried out using the developed loading system, in order to comprehend the behavior of the rubber bearing under earthquake excitation. It was confirmed that the dynamic characters of the bearing was experimentally obtained, considering dynamic interaction between structure and bearing.
|
Report
(4 results)
Research Products
(10 results)