Budget Amount *help |
¥47,970,000 (Direct Cost: ¥36,900,000、Indirect Cost: ¥11,070,000)
Fiscal Year 2011: ¥6,240,000 (Direct Cost: ¥4,800,000、Indirect Cost: ¥1,440,000)
Fiscal Year 2010: ¥18,070,000 (Direct Cost: ¥13,900,000、Indirect Cost: ¥4,170,000)
Fiscal Year 2009: ¥23,660,000 (Direct Cost: ¥18,200,000、Indirect Cost: ¥5,460,000)
|
Research Abstract |
The purpose of this research is to develop the techniques for reducing environmental loads in various processes of construction activities, such as material production, construction, demolition, and recycling. The developed techniques to reduce large amount of CO2 and industrial wastes are described as follows. (1) Demolition method with low energy emission by induction heating (2) Completely recycling aggregate and concrete by inorganic coating to reduce CO2 emission and industrial waste (3) Resource flow simulator to investigate and evaluate effect of CO2 emission reduction and waste reduction by introducing environmental techniques and policies
|