Budget Amount *help |
¥10,140,000 (Direct Cost: ¥7,800,000、Indirect Cost: ¥2,340,000)
Fiscal Year 2012: ¥2,080,000 (Direct Cost: ¥1,600,000、Indirect Cost: ¥480,000)
Fiscal Year 2011: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
Fiscal Year 2010: ¥2,600,000 (Direct Cost: ¥2,000,000、Indirect Cost: ¥600,000)
Fiscal Year 2009: ¥3,250,000 (Direct Cost: ¥2,500,000、Indirect Cost: ¥750,000)
|
Research Abstract |
In order to decrease Greenhouse Gas (GHG), the research took place the development of a automatic capture of GHG from land mobile in cooperation with the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) and also conducted feasibility evaluation to utilize the method to monitoring the land mobile by MLIT. Secondly, the research proposed a Database architecture of captured information to widely utilize for preparing global warming. Finally, together with the support members of the research, the result of the research has been included as a part of Framework Standard Document of ITU
|