Methods of LCM based on Estimating LCC for a Group of Facilities
Project/Area Number |
21360294
|
Research Category |
Grant-in-Aid for Scientific Research (B)
|
Allocation Type | Single-year Grants |
Section | 一般 |
Research Field |
Town planning/Architectural planning
|
Research Institution | Kumamoto University |
Principal Investigator |
IKI Kazuhisa 熊本大学, 大学院・自然科学研究科, 教授 (00244103)
|
Co-Investigator(Renkei-kenkyūsha) |
ONISHI Yasunobu 熊本大学, 大学院・自然科学研究科, 助教 (20381006)
MOROZUMI Mitsuo 熊本大学, 大学院・自然科学研究科, 教授 (50040449)
SHIMODA Sadayuki 熊本工業高等専門学校, 建築社会デザイン工学科, 教授 (10259971)
|
Project Period (FY) |
2009 – 2011
|
Project Status |
Completed (Fiscal Year 2011)
|
Budget Amount *help |
¥9,230,000 (Direct Cost: ¥7,100,000、Indirect Cost: ¥2,130,000)
Fiscal Year 2011: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
Fiscal Year 2010: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2009: ¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
|
Keywords | FM / LCC / LCM / 平準化 / 修繕更新 / 投資 / 推定式 / シミュレーション / LCRC / 改修 / 修繕 / CAFM |
Research Abstract |
In order to maintain the functions of buildings, it is necessary for the owner such as an enterprise to estimate all repair timings and repair costs in the life cycle of each building, and to keep the balance between the appropriation and the investment sum for repair of a group of buildings for each year by investment leveling. In this research, we suggest the following. 1. Calculation methods for estimating building LCC. 2. Some methods for leveling the repair cost of a group of buildings for each year in its life cycle. 3. Automatic estimating method using BIM.
|