Budget Amount *help |
¥19,110,000 (Direct Cost: ¥14,700,000、Indirect Cost: ¥4,410,000)
Fiscal Year 2011: ¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2010: ¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
Fiscal Year 2009: ¥9,490,000 (Direct Cost: ¥7,300,000、Indirect Cost: ¥2,190,000)
|
Research Abstract |
Purpose of this project is to develop a Simulation-Based Design(SBD) framework for design of waterjet propelled high-speed ships. In the framework, an advanced-level CFD-based optimization method and the most widely accepted Computer Aided Design system in the domestic shipyards are integrated. All tasks were successfully completed, and the realized SBD framework was shown very promising. Activity of the present work along with the results was reported in several international journals and conferences.
|