Budget Amount *help |
¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2009: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
|
Research Abstract |
In this research project, we explored a new design space of condition-based communication technique for various ITS services and we proposed 1) Adaptive Beacon Transmission and a basic condition-based autonomous packet forwarding, 2) Road-Segment-based Data Dissemination for emergency vehicle notification that limits the dissemination area to the driving route of the emergency vehicle, and 3) CB-Flooding that introduces estimation of encountering the emergency vehicle. Performances of these proposed schemes were evaluated through computer simulations and the results showed their efficiency.
|