Budget Amount *help |
¥4,680,000 (Direct Cost: ¥3,600,000、Indirect Cost: ¥1,080,000)
Fiscal Year 2011: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2010: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2009: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
|
Research Abstract |
In this paper, the electric field strength level is measured in the reception condition that is different of the distance and height and in city. As a result of the measurement, the following have been understood. 1. The electric field strength level decreases as the distance parts but the influence that buildings and landform give it is larger. 2. The electric field strength level increases as the reception point rises and are almost constant
|