Budget Amount *help |
¥4,810,000 (Direct Cost: ¥3,700,000、Indirect Cost: ¥1,110,000)
Fiscal Year 2011: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2010: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2009: ¥2,730,000 (Direct Cost: ¥2,100,000、Indirect Cost: ¥630,000)
|
Research Abstract |
Experimental and analytical studies were carried out to clarify the penetration mechanism of pile and SPT sampler(open-ended pipe pile). In the experiments of penetration and cyclic horizontal loading of piles, displacements of the surrounding soils were monitored using a PIV technique. And, strain field of the ground was successfully estimated, from which stress field would be estimated in future study.
|