Budget Amount *help |
¥19,500,000 (Direct Cost: ¥15,000,000、Indirect Cost: ¥4,500,000)
Fiscal Year 2012: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2011: ¥4,550,000 (Direct Cost: ¥3,500,000、Indirect Cost: ¥1,050,000)
Fiscal Year 2010: ¥13,000,000 (Direct Cost: ¥10,000,000、Indirect Cost: ¥3,000,000)
|
Research Abstract |
In this research, the absorbance characteristic on the surface of a strawberry was measured in detail first. And strawberry surface absorbance was increased by the mechanical damage, and it was shown clearly that the change arises in a specific wavelength band. The visualization technology of the damaged area of a strawberry was devised based on these character. By using this technology, we were able to specify the slight damage portion which occurs to the strawberry under transportation.
|