Budget Amount *help |
¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
Fiscal Year 2012: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2011: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2010: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
|
Research Abstract |
In this study, the typical meteorological year database for main Asian cities was developed using the observed meteorological data in 2000 - 2009. The model to estimate solar radiation was improved from the model for Beijing, China, which was developed by the author. Also, the weather data for air-conditioning design was developed for the Asian cities. This study lays a foundation for building simulation and air-conditioning design for main Asian cities and will contribute to global environmental protection and energy savings in buildings.
|