Budget Amount *help |
¥2,600,000 (Direct Cost: ¥2,000,000、Indirect Cost: ¥600,000)
Fiscal Year 2012: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2011: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2010: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
|
Research Abstract |
In this research, a fast transient simulation algorithm based on leapfrog-scheme for the circuit including interconnects (such as signal, power and ground) and nonlinear elements (such as transistor) was studied. Especially, a modeling method suitable for the leapfrog scheme was developed for the power and ground interconnects. Finally, an ultrafast scalable circuit simulation technique was developed by the use of GPU.
|