Budget Amount *help |
¥3,380,000 (Direct Cost: ¥2,600,000、Indirect Cost: ¥780,000)
Fiscal Year 2013: ¥780,000 (Direct Cost: ¥600,000、Indirect Cost: ¥180,000)
Fiscal Year 2012: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2011: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2010: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
|
Research Abstract |
In this study, geometric data and texture data were prepared to reproduce ruins by realistic three dimensional computer graphics. At first, various conditions of wall surfaces targeted for the image inpainting were clarified by measuring constructions in ruins and collecting data of mural paintings. Then, the conditions enabled us to synthesize images using computer graphics with consistency in boundary of textures. Additionally the adaptive interpolation of defective areas in mural paintings with loss of large part was considered. Thus by using trace drawing made by professional, it was realized restoration of an image as the same as it was when the construction was founded in days of old.
|