Development of new building foundation with existing pile
Project/Area Number |
22760413
|
Research Category |
Grant-in-Aid for Young Scientists (B)
|
Allocation Type | Single-year Grants |
Research Field |
Building structures/materials
|
Research Institution | Chiba University |
Principal Investigator |
SEKIGUCHI Toru 千葉大学, 大学院・工学研究科, 助教 (50451753)
|
Project Period (FY) |
2010 – 2011
|
Project Status |
Completed (Fiscal Year 2011)
|
Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2010: ¥2,860,000 (Direct Cost: ¥2,200,000、Indirect Cost: ¥660,000)
|
Keywords | 基礎構造 / 建築基礎 / 既存杭 / 遠心模型実験 / パイルド・ラフト基礎 |
Research Abstract |
In order to reuse existing piles that would become the problem in the near future, new building foundation method was invented. Model tests were conducted to investigate the settlement behavior of the building. The mechanism of the vertical load transmission of the foundation was investigated by computer simulation of the model test.
|
Report
(3 results)
Research Products
(9 results)