Research Abstract |
Soil compaction is important when constructing earth structures. However, we have had difficulties in presuming the internal state of earth structures and predicting their behaviors under natural disaster such as storm of rain and earthquake. In this study, simulated static compaction tests and processes of compacted earth structures considering the speed of construction with soil/water/air coupled finite element analysis. The achievement of this study is useful for the reasonable construction management.
|