Budget Amount *help |
¥47,710,000 (Direct Cost: ¥36,700,000、Indirect Cost: ¥11,010,000)
Fiscal Year 2013: ¥13,130,000 (Direct Cost: ¥10,100,000、Indirect Cost: ¥3,030,000)
Fiscal Year 2012: ¥24,570,000 (Direct Cost: ¥18,900,000、Indirect Cost: ¥5,670,000)
Fiscal Year 2011: ¥10,010,000 (Direct Cost: ¥7,700,000、Indirect Cost: ¥2,310,000)
|
Research Abstract |
This project aimed at actualizing real-time 3D modeling system called iClay. This modeling system that uses a sensor network distributed many cubic-meter-class sensor nodes in plastic clay. The distributed sensors sense distances between them, and the sensor network collects the distance information for recognizing object shape by calculating relative positions of nodes based on the collected node-to-node distances. We developed fundamental element technologies for iClay actualization, which were node-to-node distance estimation, cubic-meter antenna, wireless power transmission and node localization, and investigated potential iClay applications.
|