Budget Amount *help |
¥19,240,000 (Direct Cost: ¥14,800,000、Indirect Cost: ¥4,440,000)
Fiscal Year 2014: ¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2013: ¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
Fiscal Year 2012: ¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2011: ¥7,410,000 (Direct Cost: ¥5,700,000、Indirect Cost: ¥1,710,000)
|
Outline of Final Research Achievements |
We have investigated a method which enables us to real-time optimize feedback controllers obtaining appropriate control performance. In particular, we have developed a design methodology for an internal model control system which gives us a mathematical model of a control objective simultaneously, just-in-time control utilizing data in feedback systems, and closed loop identification. We also evaluated the effectiveness of the developed methods by experiments for the pneumatic artificial muscles, a small-sized unmanned helicopter, and camera-projector image processing together with numerical simulations.
|