Budget Amount *help |
¥5,330,000 (Direct Cost: ¥4,100,000、Indirect Cost: ¥1,230,000)
Fiscal Year 2013: ¥1,820,000 (Direct Cost: ¥1,400,000、Indirect Cost: ¥420,000)
Fiscal Year 2012: ¥1,300,000 (Direct Cost: ¥1,000,000、Indirect Cost: ¥300,000)
Fiscal Year 2011: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Research Abstract |
The new frame of the optimal design method for the electromagnetic actuators with an electromagnetic field analysis simulator is proposed. The proposed method is an optimal design system integrated with the optimization method, the modeling and the simulator. Moreover, it has two methods for the case at heavy simulation time and light simulation time in it. The developed approach is applied to the optimal design of the magnetic pole shapes of actual electromagnetic actuators, and the advantage of the developed approach is verified.
|