Budget Amount *help |
¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
Fiscal Year 2013: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2012: ¥1,560,000 (Direct Cost: ¥1,200,000、Indirect Cost: ¥360,000)
Fiscal Year 2011: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
|
Research Abstract |
(1) The MLD model of the single-cylinder engine including the engine shift is constructed on MAPLE.(2) Simulated NN-Learning law is applied for the MDL model, but it was not able to get good control performance even if changed the middle class and an NN type in various ways.(3) Simulated the switching type (gain scheduling) PID control, and a result is provided an ordinary performance, but it became clear that schedule point choice and good PID parameter tuning of the precision were necessary beforehand.(4) Performed the theoretical examination of the modified extreme seeking control theory (including the internal model use, the time integral calculus error use, and the feedback variable gain use).(5) When constituted (4) with control system, and there was the road surface change, depending was able to shorten braking distance as a result in (3).
|