Budget Amount *help |
¥3,900,000 (Direct Cost: ¥3,000,000、Indirect Cost: ¥900,000)
Fiscal Year 2014: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2013: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2012: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2011: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
|
Outline of Final Research Achievements |
We studied higher dimensional Fano manifolds using the theory of extremal contractions. We gave examples of Fano manifolds with small contractions and investigated their property. It is known that by the successive blow-up along a curve and a subvariety of codimension 2, we can get projective varieties with small contractions. We have considered Fano manifolds obtained by this construction. The case of blow-ups of the products of projective spaces are studied in detail. On the other hand, we study on the number of irreducible components of exceptional sets of small contractions. In a special case, we obtained a sufficient condition for this number to be one.
|