Budget Amount *help |
¥9,880,000 (Direct Cost: ¥7,600,000、Indirect Cost: ¥2,280,000)
Fiscal Year 2014: ¥1,950,000 (Direct Cost: ¥1,500,000、Indirect Cost: ¥450,000)
Fiscal Year 2013: ¥3,510,000 (Direct Cost: ¥2,700,000、Indirect Cost: ¥810,000)
Fiscal Year 2012: ¥4,420,000 (Direct Cost: ¥3,400,000、Indirect Cost: ¥1,020,000)
|
Outline of Final Research Achievements |
For strategic building operation and maintenance, it is important to grasp the conditions of the building in detail and integrate them. In this research, we proposed the practical method which utilize building information model produced by BIM tool for relational 3D database in building operation and maintenance. a) Method to integrate information for operation and maintenance of existing buildings into building information model. b) Method for maintenance manager to use building information model in his work. c) Method for maintenance of attribute information and geometry of building information model. The result of our research will contribute to building new method of information management in FM.
|