Budget Amount *help |
¥5,720,000 (Direct Cost: ¥4,400,000、Indirect Cost: ¥1,320,000)
Fiscal Year 2014: ¥650,000 (Direct Cost: ¥500,000、Indirect Cost: ¥150,000)
Fiscal Year 2013: ¥2,600,000 (Direct Cost: ¥2,000,000、Indirect Cost: ¥600,000)
Fiscal Year 2012: ¥2,470,000 (Direct Cost: ¥1,900,000、Indirect Cost: ¥570,000)
|
Outline of Final Research Achievements |
A method to estimate some characteristic values such as number of passing vehicles, transit velocity, vehicle classification and year model of vehicle is studied in this research. These values are needed for estimation of air pollution substance that vehicles carry out to the atmosphere. The method has a distinctive feature that is suitable especially for a metropolitan city in a developing country in East Asia. The limit and problem of the method is shown by application of it to Bangkok, Thailand.
|