Budget Amount *help |
¥4,940,000 (Direct Cost: ¥3,800,000、Indirect Cost: ¥1,140,000)
Fiscal Year 2015: ¥1,170,000 (Direct Cost: ¥900,000、Indirect Cost: ¥270,000)
Fiscal Year 2014: ¥1,430,000 (Direct Cost: ¥1,100,000、Indirect Cost: ¥330,000)
Fiscal Year 2013: ¥2,340,000 (Direct Cost: ¥1,800,000、Indirect Cost: ¥540,000)
|
Outline of Final Research Achievements |
We developed the "2D projector" which can project a 2D image onto a 3D object and display images easily viewable for users. Point cloud registration between the model point set and the data point set is used to obtain the detailed shape information of the 3D projection object. The model point set obtained from offline measurement is high-resolution and dense data. In contrast, the data point set measured by TOF camera is sparse data. Additionally, we developed a distortion correction technique of projected images using the shape information of the 3D projection object obtained as point cloud data. The technique enables 2D image projection onto a curved concave-convex surface.
|