Project/Area Number |
25340118
|
Research Category |
Grant-in-Aid for Scientific Research (C)
|
Allocation Type | Multi-year Fund |
Section | 一般 |
Research Field |
Design and evaluation of sustainable and environmental conscious system
|
Research Institution | Kitami Institute of Technology |
Principal Investigator |
|
Project Period (FY) |
2013-04-01 – 2016-03-31
|
Project Status |
Completed (Fiscal Year 2015)
|
Budget Amount *help |
¥5,200,000 (Direct Cost: ¥4,000,000、Indirect Cost: ¥1,200,000)
Fiscal Year 2015: ¥520,000 (Direct Cost: ¥400,000、Indirect Cost: ¥120,000)
Fiscal Year 2014: ¥910,000 (Direct Cost: ¥700,000、Indirect Cost: ¥210,000)
Fiscal Year 2013: ¥3,770,000 (Direct Cost: ¥2,900,000、Indirect Cost: ¥870,000)
|
Keywords | ハイドレート化貯蔵 / バイオガス / コジェネレーションシステム / メタンハイドレート / ハイドレート生成 / 生成促進効果 / 圧力温度平衡曲線 |
Outline of Final Research Achievements |
It becomes seriously urgent problem to change fossil fuels to biomass fuels as renewable energy in recent years, and the effective use is largely expected. Since the amount of biogas released from digesters in the sewage treatment plant commonly varies every season in a year, some levelling operations are needed for the energy saving methods. In this study numerical simulation was achieved, based on the experimental data which were collected in the existent plant, to build highly efficient co-generation system. The hydrate storage method was analytically proposed for its practical formation technologies, and it was clarified the performance efficiency could be highly obtained in the simulated operation of CGS.
|