Budget Amount *help |
¥4,290,000 (Direct Cost: ¥3,300,000、Indirect Cost: ¥990,000)
Fiscal Year 2015: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2014: ¥1,040,000 (Direct Cost: ¥800,000、Indirect Cost: ¥240,000)
Fiscal Year 2013: ¥2,210,000 (Direct Cost: ¥1,700,000、Indirect Cost: ¥510,000)
|
Outline of Final Research Achievements |
Braille Rreading Sspeed (BRS) can be altered by the content of sentences. Thus, we aimed to develop thea braille reading chart for objective assessment of BRS. To collect the data for development of the chart, we performed the an experiment to measure the BRS of 79 braille readers using 25 different kinds of sentences and collect categorized individual characteristics, such as the onset of the blindness and tactile sensitivity. We tried to build a hierarchical linear model for predicting BRS based on the experiment data of the experiment. The model was showedn that both of individual-level variables (the onset of the blindness and frequency of using braille) and sentence-level variables (word familiarity, vocabulary level, and so on) had a statistically significant influenced statistically significantly on BRS. We will make public the prototype of the chart that hasve selected sentences assessed by the model.
|